ADU Construction Services

ADU Construction at a Glance

  • ADUs are independent secondary homes used for rental income, family housing, guests, or home offices.
  • Options include detached units, attached units, garage conversions, and junior ADUs (up to 500 sq. ft.).
  • Detached ADUs typically cost 150,000–400,000, while garage conversions and JADUs are generally more affordable.
  • Construction typically takes four to six months after permitting, though zoning, utility connections, and site conditions can affect costs and timelines.

Testimonials

“We had the most amazing experience getting our walls painted throughout our home and also having our vinyl floor planks installed. Marvin, Joel and their team were professional, prompt, trustworthy, hardworking and EFFICIENT! We are extremely happy with the results and will be hiring them again for other jobs in the future.“

– Elysia M

An accessory dwelling unit (ADU) is a second, self-contained home on your property, and building one is a major construction project that works best with an experienced contractor. This page is for Los Angeles homeowners who want to add living space for family, tenants, or guests and want to understand the options, process, and costs before they start.

Blue Coast Pro Builders & Painting helps homeowners across the Greater Los Angeles area and Los Angeles County plan and build ADUs. If you’re curious what’s possible on your property, we’d be glad to talk it through with you. Contact us today for more information!

What is an Accessory Dwelling Unit (ADU)?

An ADU, sometimes called a granny flat, in-law unit, or guest house, is a secondary residential structure on the same lot as an existing home. California law allows at least one ADU on most single-family lots, making ADUs one of the most practical ways to add living space and housing in a competitive market. Homeowners use them for rental income, multigenerational living, home offices, and long-term flexibility.

ADU Construction in Los Angeles: Types We Build

  • Detached ADUs are standalone structures in the backyard, offering the most privacy and design freedom.
  • Attached ADUs share at least one wall with the main house.
  • Garage conversions transform an existing garage into a livable unit, often the faster and more economical route.
  • Junior ADUs (JADUs) are compact units up to 500 square feet built within the existing home.

Whether you prefer a custom ADU design or a prefab ADU approach, we help you choose what fits your lot and budget.

Our ADU Construction Process

Our experienced team of ADU specialists manages every step of the project, from initial design to final finishing with durable materials. Our ADU construction process includes the following steps:

  1. Free consultation and site visit. We review your property, goals, and zoning.
  2. Design phase. Architectural plans and structural engineering are prepared for the ADU project, including a site survey.
  3. Permitting. We manage submission to the Los Angeles Department of Building and Safety or your local agency and handle corrections for local regulations.
  4. Site preparation and utilities. We prepare the site and plan utility access, including separate utilities if desired.
  5. Construction. ADU building, including foundation, framing, systems, and finishes proceed with regular updates.
  6. Final inspection. After the building passes inspection, you get the keys.

Using pre-approved plans can sometimes speed approval.

ADUs vs. Home Additions

An addition extends your existing home and shares its kitchen, systems, and entrance. An ADU is a separate residence with its own kitchen, bathroom, and usually its own entrance, so you can rent it out or live in it independently.

Additions suit growing households that want a bigger main home, while ADUs suit those wanting independent living space, rental income, or a separate home for relatives. ADUs also follow their own set of state and local rules, which can differ from addition rules.

Problems Involved in Building an ADU

Honest planning means knowing the challenges.

  • Cost: What is the most expensive part of building an ADU? Typically it is construction itself, meaning labor, foundation, and structure, followed by utility connections and site work.
  • Permits and local zoning regulations: Setbacks, height limits, and local building codes all apply, and HOA rules can add wrinkles, though California law limits how much an HOA can restrict ADU development.
  • Disruption: Construction brings noise and use of your yard.
  • Neighborhood concerns: Why are people against ADUs? Common objections involve density, parking, noise, and neighborhood character. Many of these are addressed by good design and code compliance.
  • A drawback to consider: Upfront cost and the loss of yard space are the most common, and tax and financing implications deserve a conversation with a professional to determine your property’s potential.

Choosing the Right ADU Contractor

Look for a licensed contractor (verify status with the California Contractors State License Board), proof of general liability and workers’ compensation insurance, recent local experience with zoning and permitting, and strong references. Compare at least three itemized bids and make sure the contract clearly defines scope.

How Much Does an ADU Cost?

Costs depend on type, size, finishes, and site conditions. Detached ADUs often run roughly $240 to $300 or more per square foot in this market, and total projects commonly range from $150,000 to $400,000. Design and permit fees alone can run $5,000 to $15,000.

What is the cheapest way to build an ADU? Usually a garage conversion or a junior ADU, since they use existing structure and avoid new foundations.

Call Blue Coast Today

Ready to explore an ADU on your property? Contact Blue Coast Pro Builders & Painting for a free consultation and site visit. We serve homeowners living in the Greater Los Angeles area.

FAQs About ADU Contractor Services

How long does an ADU take to build?

About four to six months of construction after permitting, with permit review taking weeks to a few months.

A JADU must include an efficiency kitchen, which generally means a food preparation counter and storage cabinets of reasonable size, along with a cooking appliance. It may share a bathroom with the main home.

In most cases, no, you don’t need to provide parking. Los Angeles generally doesn’t require parking for ADUs, and replacing a converted garage’s spaces typically isn’t required.

Properties with ADUs often appraise higher, though returns can vary.

Generally, yes, though local rules may apply, so check with us before planning.